The invoice went out of Joist looking clean. Two line items, a total, your logo at the top.
Then the reply comes back: Three guys for two days, on what?
You know the charge was right. You also know the hours on that invoice came off a text message and the back of a material receipt.
If you are shopping for a Joist alternative for electrical contractor time tracking, that reply is usually why. The honest answer is that you probably do not need to replace Joist at all.
Joist is an estimating and invoicing app. It was never built to capture crew hours, and no plan adds them, including the newer Run plan that adds job scheduling. What is missing sits upstream of the invoice, out in the field.
This post covers what Joist does and does not do, what a customer needs to see next to an hours number, and how to produce that backup, including the version that costs nothing and uses the tools you already own.
Does Joist track time?
No. Joist's pricing page lists no time clock, no timesheets, and no crew hour capture on any plan. It tracks documents and money (estimates, invoices, payments, expenses, change orders), not labor.
Here is what each plan includes, taken from joist.com/pricing and its plan comparison table, checked October 25, 2026.
| Plan | Monthly | Billed annually | What it adds | Crew time tracking |
|---|---|---|---|---|
| Basics | $10/mo | $8.34/mo | Up to 5 documents a month, estimates to invoices, online payments, digital signatures, work orders, homeowner financing | None listed |
| Pro | $17/mo | $14.17/mo | Unlimited documents, logo, job photos and attachments, expense tracking, QuickBooks sync | None listed |
| Elite | $32/mo | $26.67/mo | Change orders, license and insurance on documents, sales and business reports, Joist Reviews | None listed |
| Run (new) | $70/mo introductory (list $100) | $58.33/mo introductory | Organize jobs, schedule visits, link jobs to estimates, invoices and clients | None listed |
Every plan has a 14-day free trial with no card, and Joist says its free plan is no longer available. The Run price is labeled as a 30% introductory discount, so check it again before you budget around it.
That is not a knock on Joist. A time clock is not what it sells.
But it does mean the labor hours on a Joist invoice were typed in by somebody who was remembering. And the customer reading that invoice has no way to check the number.
What Joist does well, and why you should keep it
Joist is a good estimating and invoicing tool for a small shop, and nothing on this page argues for tearing it out.
You can build an estimate on the tailgate, convert it to an invoice, take a card, and send it before you leave the driveway. Pro and up add job photos and attachments, expense tracking, and QuickBooks sync.
For a residential service shop billing flat rate off one or two trucks, that is a complete workflow.
One thing to be clear about, because it decides how you set up the rest: Joist captures no hours, so whatever its QuickBooks sync moves, it cannot move a time record that was never made. An invoice's labor line can land in QuickBooks as income, but the labor cost side of job costing has to come from somewhere else on every plan.
Job costing for electricians covers what that setup looks like. The same question (do hours arrive as time records, or only as an invoice total?) is the one to ask of any tool, as the busybusy QuickBooks comparison walks through.The line where Joist stops
A T&M invoice is the last step in a four-step chain, and Joist only owns the last two.
- The crew does the work.
- Somebody records what happened, while it is still fresh.
- That record becomes the labor line.
- The invoice explains itself to the customer.
That is not a pricing problem and it is not a trust problem. The charge was fair. The explanation was missing.
The damage downstream of a missing record is slow payment, discounted invoices, and arguments that eat the office's week. The pattern is the same on a $6,400 service invoice as it is on a stadium.
What a customer needs to see next to an hours number
Six things: the date, who was on site, where in the building, the span of time, what got done, and something that corroborates it.
Five of the six are easy. The one that decides the argument is what got done.
| The line that gets questioned | The line that gets paid |
|---|---|
| Labor, 8.77 hrs, $657.75 | Thu 7/17, J. Alvarez, 7:02a–3:48p (8.77 hrs), second-floor east wing: pulled and terminated circuits 12–18, set two 20A GFCI receptacles at the wet bench, meggered the homerun. On site, verified. |
Same hours. Same money. One of them ends a phone call before it starts.
A note on GPS, since every time-tracking vendor leads with it. A location stamp belongs on that document as exactly one phrase, on site, verified, corroborating a billing claim.
It is not a movement trail and you should not hand your customer one. Your crew will read whatever you send out, and a map of their day reads as distrust.
The hard part: getting an electrician to write anything down
Mandates fail. The note has to take under fifteen seconds and the crew has to understand it protects the work they did, not audits it.
"Fill out your timesheet" is a compliance ask with no payoff for the guy holding the phone at 3:50 on a Thursday.
Here is the version that gets cooperation, said out loud, once, in the shop:
When the customer asks what we did that day, this sheet is what I hand them. If it says nothing, I am the one eating hours you actually worked.
That reframes the note from paperwork into the thing that stops a customer chiseling the company. It puts the crew on the same side as the office, which is the only framing a journeyman has any reason to go along with.
The ten-word formula
Three parts. No sentences, no punctuation, no spelling test.
- Where: floor, room, panel, feeder, unit number
- What: the verb (pulled, terminated, set, trimmed, meggered, demoed, roughed)
- How far: circuit numbers, device count, footage
- 2nd flr east: pulled/terminated ckts 12-18
- Panel LA: swapped 3 breakers, torqued lugs to spec
- Unit 4 rough-in: 22 boxes set, 180 ft MC
- Svc call: found open neutral at ceiling j-box, repaired, retested
One line per man, per job, per day. If the foreman writes all four lines for his crew, that is fine. The requirement is that somebody who was there wrote it before he went home.
More on how this fits a T&M billing routine is in T&M billing best practices.
Five things to require of any Joist alternative
Whether you add one tool or replace three, these five are what separate an app that produces defensible labor backup from an app that produces a number.
- It captures hours where the work happens. Hours reconstructed at the shop at 5 p.m. are a guess, and a customer can usually tell.
- It captures what got done, attached to those hours. A clock-in with no description gives you the same unprovable number you have now.
- It keeps bill rate separate from cost rate. Many time apps only store what you pay the electrician. Print that on a customer document and you have published your margin.
- It sends hours to QuickBooks as time, not just as an invoice total. Time records are what feed job costing and payroll. An invoice total feeds neither.
- It holds a punch with no signal. Basements, mechanical rooms, elevator shafts, metal buildings, and unenergized new construction all kill cell service. Ask exactly what happens to a clock-in made with no bars: is it saved on the phone, when does it upload, and what if the app is closed before it reconnects?
The options, sorted by which hole you are filling
Most "best Joist alternative" lists rank tools against each other. That is the wrong question. The right one is which step of the chain is broken at your shop.
| Your bottleneck | Category of tool | Examples | Captures crew hours | Captures what got done |
|---|---|---|---|---|
| Estimates take too long | Estimating and invoicing | Joist | No (none listed on any plan) | No |
| Nobody knows where the trucks are going | Scheduling and dispatch | Jobber, Housecall Pro, Joist Run | Jobber: from its Connect plan. Housecall Pro: turned on from its in-account app store, plan tier not stated. Joist Run: none listed | Job notes; ask whether the customer ever sees them |
| Progress billing and AIA pay apps | Commercial project accounting | Varies | Ask the vendor | Usually daily logs; ask who sees them |
| Hours are guesses and invoices get argued | Crew time plus labor backup | ClockShark, busybusy, Workyard, Connecteam, FieldTimesheet | Yes | Varies: check whether the note reaches a customer-facing document |
| Nothing is broken except the paperwork habit | Joist plus paper or a spreadsheet | What you already own | Yes, if somebody runs the routine | Yes, if somebody runs the routine |
The Jobber and Housecall Pro cells come from each vendor's own pricing and feature pages, read in October 2026. Side-by-side pages with dated prices exist for Jobber, Housecall Pro, ClockShark, busybusy, Workyard and Connecteam, and the Jobber pricing breakdown shows which tier first includes time tracking.
Two things this table will not do for you. It will not price anything, because per-user rates and overage tiers change constantly. Pull the numbers off each vendor's own pricing page the week you decide.
And it will not tell you a category is safe. Plenty of tools in row four capture a note the office can read and no customer ever sees. Ask to see the report the customer receives before you sign anything.
On price, the shape matters more than the sticker. Example arithmetic, using a made-up structure of a $50 base plus $6 per user that matches no particular vendor: 18 electricians works out to $50 + (18 × $6) = $158 a month, on top of Joist Pro at $17 monthly, for $175 a month total. Run it with your own headcount and whatever the vendor actually charges.
The free version: do it with Joist and a phone
You can produce defensible labor backup today, on whatever Joist plan you already have, with no new subscription. It takes about two minutes a day in the office and ten seconds a day per electrician.
Step 1: Name the job the same way in both places. Whatever the job is called in Joist is what the crew writes in the text. "Harrison St remodel" in one place and "Harrison" in the other costs you twenty minutes a week in matching. Step 2: Set the expectation on the estimate, not on the invoice. Put this in the notes field of every T&M estimate you send:Time and material. Labor billed at $__/hr per electrician. A daily labor record listing the date, the electrician, the hours worked, and the work performed will accompany every invoice. Any additional scope will be documented on a signed change order before that work proceeds.
That paragraph does more to prevent an invoice fight than anything you can do afterward. The customer agreed to be shown hours before there were any hours.
Step 3: Send the crew one text, once. Word it like this:End of day, one text to this number: job name, your in and out times, one line on what you got done. Ten words is plenty. This is what I show the customer when they ask about the bill.Step 4: Keep one sheet per job. A spreadsheet, or a printed form on a clipboard. These are the columns.
| Column | What goes in it |
|---|---|
| Date | One row per man per day, never a weekly roll-up |
| Electrician | Name, and classification if you bill journeyman and apprentice at different rates |
| In / Out | Actual times, to the minute. Round numbers all week read as estimates |
| Hours | Decimal hours, so the math is checkable |
| Area | Floor, unit, panel, or room: where in the building |
| Work performed | The crew's ten words, cleaned up but not rewritten |
| Bill rate | What you bill. Never what you pay |
| Amount | Hours × bill rate, per row |
Four rules for that sheet, and every one of them exists because breaking it invites a question:
- Bill rate only. A sheet showing what you pay the man shows your margin. Keep cost on the internal copy.
- One row per man per day. Rolling a week into one line is exactly what makes a customer ask what the week consisted of.
- The total matches the Joist labor line to the penny. A sheet totaling $1,214.25 against an invoice line of $1,220 restarts the argument you were trying to end.
- Travel, material runs, and standby get their own rows. Each with its own description, or you leave them off. Burying them inside "labor" is what gets found.
If you would rather not build the forms, the T&M Billing Backup Kit has all four of them blank and free: labor backup sheet, daily field report, change order log, and a T&M work authorization.
What it looks like filled in
Here is one day on one job, with made-up numbers so the arithmetic is visible.
Panel change-out, two electricians, Thursday 7/17. Bill rate $75/hr for both.
- J. Alvarez, 7:02a–3:48p = 8.77 hrs. Basement: demoed 200A main, set new panel, landed and labeled 24 circuits.
- R. Kim, 7:05a–2:30p = 7.42 hrs. Basement: pulled new 4/0 aluminum SER from the meter, torqued lugs to spec, meggered feeders.
The Joist invoice reads Labor, 16.19 hrs, $1,214.25. The attached sheet says which two men, which hours, and that a 200A panel came out and 24 circuits went back in.
The customer can reconstruct the number without calling you. That is the entire trick, and it does not require software.
If you want to see a finished one before you build yours, there is an annotated sample billing packet with no signup on it.
When to keep Joist and change nothing
Adding software to a problem you do not have is how a twelve-person shop ends up with four subscriptions and one working process. Stay where you are if any of these describe you.
- You are the only one on the tools. You know what you did. A time app records the thing you already remember.
- You bill flat rate, not T&M. If hours never appear on the invoice, there are no hours to back up.
- Under about five invoices a month and no disputes in the last year. Do not fix a system that is producing paid invoices.
- You already run a paper daily field report and it comes back filled in. The paper is the record. It does not need to become an app.
If you want to put a number on what the arguing itself costs before you spend anything, the invoice dispute calculator runs that arithmetic with your own inputs.
Common questions
Does Joist track employee time?No. None of the four plans on joist.com/pricing (Basics, Pro, Elite and Run, checked October 25, 2026) lists a time clock, timesheets, or crew hour capture. Joist handles estimates, invoices, payments, expenses, change orders, and on Run, job scheduling.
Can I add a time clock to Joist?Not inside Joist. You run a separate time app or a manual daily routine and carry the hours onto the invoice line yourself. There is no time-tracking integration to plug into.
How do I bill time and materials in Joist?Add labor as its own line item with the hours and the rate, put materials on separate lines, and attach a labor backup sheet listing each electrician, each day, and the work performed. Pro, Elite and Run include attachments, so the backup travels with the invoice. On Basics, send it alongside the invoice in the same email.
Does Joist sync time to QuickBooks?No. QuickBooks sync is listed on Pro, Elite and Run, but Joist captures no hours, so there is no time record for it to send. The labor cost side of job costing has to come from a time tool or a manual entry, on every plan.
What do I show a customer who questions the hours on a T&M invoice?A one-page labor record: date, electrician, in and out times, decimal hours, area of the building, what got done, bill rate, and amount, totaling to the invoice line exactly. Send it the same day they ask, not the following week.
Is there a free Joist alternative for time tracking?Some time apps publish free plans: when we last checked their pricing pages, busybusy listed a $0 plan, Connecteam a free plan up to 10 users, and Homebase a free plan for one location up to 10 employees (see busybusy, Connecteam, Homebase for the dated details). A shared spreadsheet plus one daily text costs nothing at all. The free path works fine as long as somebody runs the routine every single day; it fails the first week nobody does.
Do I have to leave Joist to fix this?Usually not. The gap sits upstream of the invoice, so the fix is adding a way to capture crew hours and work descriptions, not replacing invoicing that already works.
Should the crew's note go on the customer's copy?Yes. That is what it is for. Keep it factual and about the work, and keep what you pay each electrician on the internal report. Any document showing your cost rate is showing your margin.
The short version
Joist writes a good invoice. It just cannot tell your customer what the labor line means, because it never captured the work.
You can close that gap this week with a text message, a spreadsheet, and one paragraph in your estimate. If you outgrow that, buy the layer that is actually missing rather than replacing the part that already works.
The charge was fair. Make sure the explanation ships with it.