Time & Material Work Authorization
Sign before the first hour is worked
1. Parties and job
2. Scope of work to be performed on a T&M basis Name drawings or scope letters by number and date.
3. What is not included Every line here is an argument you will not have.
4. Labor bill rates Billing rates, not wages. Read this section out loud together.
Classification Regular / hr Overtime (1.5x) Sat / Sun / Holiday Notes
Foreman
Journeyman
Apprentice
Service technician
Page 1 of 2 · Customer initials ______
5. Other billable items This is the section customers quote back at you. Fill it in completely.
Item How It Is Billed Rate / Markup Billable?
Materials and equipment furnished by contractorCost plus markupY / N
Supply house runs and material pickupBilled as labor, actual timeY / N
Travel to and from the job siteBilled as labor, actual timeY / N
Mileage beyond ____ miles from shopPer mileY / N
Equipment and tool rentalCost plus markupY / N
Permits and inspection feesAt cost, no markupY / N
Dumpster and debris removalCost plus markupY / N
Small tools and consumablesIncluded in labor raten/aNo charge
Standby time caused by othersBilled as labor, actual timeY / N
Y / N
6. How time and material billing works
  1. Hours are recorded on site each day, by worker, with a written description of the work performed.
  2. Every invoice is accompanied by a labor backup sheet showing date, worker, classification, what was done, hours, bill rate, and amount.
  3. Daily field reports are available on request and are provided automatically on jobs longer than five working days.
  4. Material and equipment charges are supported by supplier invoices on request.
  5. Work requested outside Section 2 is logged as a change order and priced before it is performed whenever conditions allow. If a verbal go-ahead is given in the field, Contractor confirms it in writing the same day.
  6. Time and material means the final cost is not known at signing. Section 7 sets the point at which Contractor stops and checks in.
  7. Questions on any line item should be raised within 10 days of the invoice date, while the crew and the records are still fresh.
7. Estimate and check-in threshold A good-faith estimate is not a fixed price. Say so out loud.
8. Authorization

Customer authorizes Contractor to perform the work described in Section 2 on a time and material basis at the rates set out in Sections 4 and 5. Customer confirms that the person signing below has authority to authorize work and approve charges for the property named in Section 1.

Customer Signature
Print Name / Title
Date
Contractor Signature
Print Name / Title
Date
Before you use this on a real job, have your own attorney review the terms and adjust them for your state, your license, and your contract forms. This is a starting point for the conversation, not legal advice.
Page 2 of 2